What do piping codes and standards interviews test? Interviewers check whether you can pick the governing code for a system (ASME B31.1, B31.3, B31.4, B31.8, B31.9 or B31.12), tell a code from a standard and a project specification, name the component standards behind every line item (ASME B16, MSS SP, ASTM, API), explain where BPVC Section VIII and Section IX fit, and apply in-service codes such as API 570. The 55 questions below cover all of it, each with a one-line answer you can say in the room followed by the engineering detail.
Key takeaways
- A code sets minimum safety rules; a standard defines a product, dimension or method; a specification adds the owner’s project-specific rules on top.
- ASME B31.3 governs process plants and ASME B31.1 power plants. B31.2 and B31.11 are withdrawn — slurry pipelines now sit inside B31.4, and hydrogen has its own code, B31.12.
- B31.3 hydrotest is 1.5 × design pressure (temperature-corrected, held at least 10 minutes); pneumatic is 1.1 ×. B31.1 pneumatic is 1.2 ×.
- ASME BPVC is published on a two-year cycle (current: 2025 edition); Section IX qualifies welding, Section V gives NDE methods, but the construction code sets acceptance criteria.
- For operating plants, API 570 (5th edition, 2024) is the piping inspection code, backed by API 574, 571, 578, 580/581 and API 579-1/ASME FFS-1.
Every piping decision — wall thickness, flange rating, weld examination, test pressure — traces back to a code or standard. That is why piping codes and standards interview questions open almost every interview for piping design, stress, construction, QA/QC and inspection roles in refineries, LNG, fertilizer, cement and power plants.
This guide has been rewritten and checked against the current publications interviewers quote: ASME B31.3-2024, the 2025 ASME Boiler and Pressure Vessel Code, API 570 (2024) and the ASME B16 and MSS SP series. It also corrects points older interview guides still get wrong, such as listing B31.2 and B31.11 as active codes or calling flanges “ANSI B16.5”.
How to answer like a senior engineer
Give the one-line definition, name the exact document and edition logic (“B31.3, the edition named in the contract”), then add one real example: “On a fertilizer plant revamp we had B31.3 process lines tying into B31.1 boiler external piping, so the code break had to be shown on the P&ID.” Code-backed, practical answers beat memorised lists.
Section 1: Codes, standards and specifications (Q1–Q7)
Q1What is a piping code?
Short answer: A piping code is a consensus document that sets the minimum mandatory requirements for designing, selecting materials for, fabricating, erecting, examining and testing a piping system so that it is safe for its intended service.
A code such as ASME B31.3 tells you how to calculate pressure design thickness, which materials and joints are permitted, what examination and leak testing are required and what records must be kept. It does not design the system for you — it defines the safety floor. It becomes legally or contractually binding when a regulation, a jurisdiction or the purchase contract adopts it.
Q2What is the difference between a code and a standard?
Short answer: A code tells you what must be achieved for safety across a whole system; a standard defines how a particular product, dimension, material or test is made or performed.
ASME B31.3 (code) says flanged joints must be suitable for the design pressure and temperature; ASME B16.5 (standard) gives the flange dimensions, bolting and pressure–temperature ratings that make a Class 300 flange interchangeable worldwide. Codes reference standards, and a referenced standard carries the code’s authority for that item.
Q3What is a specification, and how is it different from a code and a standard?
Short answer: A specification is a project or company document that states exactly what is required for one job — it selects codes and standards and adds owner requirements that are stricter or more specific.
Examples are a piping material specification (pipe classes), a welding and NDE specification, or owner standards such as Saudi Aramco SAES-L documents, Shell DEPs or PIP practices. A specification can tighten a code (for example, 100% radiography where B31.3 asks for 5% random) but should never relax it.
| Document | Purpose | Language | Becomes mandatory when | Piping example |
|---|---|---|---|---|
| Code | Minimum safety rules for a whole system | “shall” | Adopted by law, jurisdiction or contract | ASME B31.3, ASME B31.1, API 570 |
| Standard | Defines a product, dimension, material or test method | “shall” (for that item) | Referenced by a code or specification | ASME B16.5, ASME B36.10M, ASTM A106 |
| Specification | Project- or owner-specific requirements | “shall” | Issued with the contract | Pipe class spec, NDE spec, SAES-L series |
| Recommended practice (RP) | Proven guidance and good practice | “should” | Only if a contract or regulation adopts it | API RP 574, API RP 578, API RP 571 |
| Guideline / directive | Legal framework or non-binding guidance | Varies | Directive: by law in that region | EU PED 2014/68/EU, ASME PCC-1 |
Q4What is a recommended practice (RP)?
Short answer: An RP is published guidance — written mostly with “should” — that captures proven practice but is not mandatory unless a contract, owner specification or regulation adopts it.
API RP 571 (damage mechanisms), RP 574 (piping inspection practices) and RP 578 (material verification) are examples. API 570, by contrast, is a code: once adopted, its “shall” statements are binding for in-service piping.
Q5Why are codes and standards important in piping engineering?
Short answer: They protect people, plant and the environment by turning decades of failure experience into consistent minimum rules, and they make components interchangeable across suppliers and countries.
Practically, they let a buyer in Karachi order an NPS 6 Class 300 weld neck flange from a mill in Italy and know it will bolt to a valve made in China. They also give inspectors, insurers and authorities a common, auditable acceptance basis.
Q6Does compliance with a code guarantee a safe design?
Short answer: No. Codes set minimum requirements; the designer is still responsible for engineering judgment on loads, corrosion, operating upsets and anything the code does not address.
ASME B31.3 states this itself: it is not a design handbook and does not replace competent engineering. Typical gaps that need judgment are two-phase slug forces, vibration, flashing, erosion and process upset temperatures.
Q7Who is responsible for selecting the piping code?
Short answer: The owner. Under ASME B31.3 the owner selects the code section and fluid service categories, and the designer applies it.
B31.3 also defines who does what: the owner (overall compliance and the owner’s inspector), the designer (design meets the code), and the manufacturer, fabricator and erector (fabrication and examination). Where a jurisdiction mandates a code — for example for boiler external piping — that requirement overrides the owner’s choice.
Section 2: The ASME B31 Code for Pressure Piping (Q8–Q20)
Q8What is the ASME B31 Code for Pressure Piping?
Short answer: ASME B31 is a family of separately published piping codes, each covering one type of installation — power, process, liquid and gas pipelines, refrigeration, building services and hydrogen — plus supporting standards for stress intensification, toughness, seismic design and personnel qualification.
Each section is a complete code for its scope. The sections are revised on roughly a two-year cycle, and an inquiry and interpretation process lets users ask ASME how a paragraph should be read. The table below shows which sections are current and which have been withdrawn.
| Section | Title | Typical scope | Status |
|---|---|---|---|
| B31.1 | Power Piping | Power stations, boiler external piping, industrial and institutional steam, geothermal, district heating | Active |
| B31.2 | Fuel Gas Piping | Fuel gas in buildings (historic) | Withdrawn — use NFPA 54 / ANSI Z223.1 or local fuel gas codes |
| B31.3 | Process Piping | Refineries, chemical, petrochemical, pharmaceutical, LNG, cryogenic, semiconductor plants and terminals | Active — 2024 edition current |
| B31.4 | Pipeline Transportation Systems for Liquids and Slurries | Crude, products, NGL, liquid CO2, liquid ammonia, liquid alcohols and slurries | Active — absorbed B31.11 from the 2012 edition |
| B31.5 | Refrigeration Piping and Heat Transfer Components | Refrigerant, brine and secondary coolant piping | Active |
| B31.8 | Gas Transmission and Distribution Piping Systems | Onshore and offshore gas pipelines, compressor and metering stations, distribution mains | Active; B31.8S covers integrity management |
| B31.9 | Building Services Piping | Heating water, chilled water, low-pressure steam and condensate in buildings | Active |
| B31.11 | Slurry Transportation Piping Systems | Mineral, coal and tailings slurry pipelines | Withdrawn — now part of B31.4 |
| B31.12 | Hydrogen Piping and Pipelines | Gaseous and liquid hydrogen industrial piping and pipelines | Active |
| B31E / B31G / B31J / B31Q / B31T | Supporting standards | Seismic design; corroded pipeline strength; SIFs and flexibility factors; pipeline personnel qualification; toughness requirements | Active |
Q9Which piping code is used in refineries and petrochemical plants?
Short answer: ASME B31.3 Process Piping.
B31.3 covers piping inside the plant boundary — process units, tank farms within the plant, utility systems serving the process and packaged equipment piping. Lines leaving the fence as cross-country pipelines change to B31.4 (liquids) or B31.8 (gas) at a defined code break.
Q10What fluid service categories does ASME B31.3 define?
Short answer: Normal fluid service, Category D, Category M, High Pressure, High Purity and Elevated Temperature fluid service.
Category D is nonflammable, nontoxic, not damaging to human tissue, at no more than 1035 kPa (150 psig) and −29 °C to 186 °C, so relaxed examination and an initial service leak test may be used. Category M (Chapter VIII) is for fluids where a single exposure to a very small quantity can cause serious irreversible harm. High Pressure (Chapter IX) applies when the owner designates it, typically above Class 2500 ratings. High Purity (Chapter X) covers pharmaceutical and semiconductor systems. Elevated Temperature service flags piping operating in the creep range. Everything else is Normal fluid service.
Q11What is the difference between ASME B31.1 and ASME B31.3?
Short answer: B31.1 is for power generation and steam systems; B31.3 is for process plants. They differ in allowable stress basis, examination rules and test pressures.
B31.1 is generally more conservative on allowable stress at high temperature and has its own rules for boiler external piping. B31.3 uses fluid service categories to scale examination (5% random radiography for Normal service, 100% for Category M and High Pressure). See the comparison table.
| Item | ASME B31.1 Power Piping | ASME B31.3 Process Piping |
|---|---|---|
| Typical facilities | Thermal, combined-cycle and captive power plants; industrial steam; district heating | Refineries, petrochemical, chemical, fertilizer, LNG, pharmaceutical plants |
| Typical fluids | Steam, feedwater, condensate, fuel oil and gas to boilers, lube oil | Hydrocarbons, chemicals, toxic and cryogenic fluids, utilities |
| Service categories | Not used in the same way | Normal, Category D, Category M, High Pressure, High Purity, Elevated Temperature |
| Boiler interface | Boiler external piping (BEP) — Section I jurisdiction, B31.1 construction rules | Not applicable |
| Hydrostatic test | 1.5 × design pressure, minimum 10 min hold | 1.5 × design pressure × ST/S, minimum 10 min hold |
| Pneumatic test | 1.2 × design pressure | 1.1 × design pressure |
| Examination (base) | Depends on pressure, temperature and weld type | Normal service: 5% random RT/UT of girth welds plus visual |
Q12How do you decide which B31 section applies to a system?
Short answer: Start from the facility type and fluid, then check pressure, temperature and the owner’s specification and local law — and mark the code breaks on the P&IDs.
Check (1) what the plant is (process plant, power station, pipeline, building), (2) the fluid and hazard, (3) design pressure and temperature against each code’s scope limits, (4) jurisdictional requirements such as boiler laws, and (5) the contract. A single site often has several codes: a fertilizer plant may use B31.3 for process lines, B31.1 for the boiler steam header and B31.9 for the admin building HVAC.
| Facility / system | Usual governing code | Watch for |
|---|---|---|
| Refinery, petrochemical, chemical, fertilizer process units | ASME B31.3 | Category M and High Pressure designations |
| LNG and cryogenic process piping | ASME B31.3 | Low-temperature impact testing; NFPA 59A for the facility |
| Thermal / combined-cycle power plant steam and feedwater | ASME B31.1 | Boiler external piping under Section I |
| Captive steam in a cement or sugar plant | ASME B31.1 (often) | Owner may specify B31.3 for process steam users |
| Crude oil and product pipelines, liquid CO2, slurry pipelines | ASME B31.4 | Station piping vs line pipe limits |
| Natural gas transmission and distribution | ASME B31.8 (+ B31.8S) | Location class and design factor |
| Industrial ammonia and refrigeration systems | ASME B31.5 | Owner may move ammonia process piping to B31.3 |
| Hospitals, offices, airports — HVAC and utilities | ASME B31.9 | Scope pressure and temperature limits |
| Hydrogen production, refuelling and pipelines | ASME B31.12 | Material performance factors for embrittlement |
Q13What is a code break, and where is the boundary between B31.3 piping and an ASME Section VIII vessel?
Short answer: A code break is the point where one code’s jurisdiction ends and another’s begins. For a vessel, Section VIII normally ends at the first circumferential weld for welded nozzles, the face of the first flange for bolted connections, or the first threaded joint.
Piping beyond that point is B31.3 (or B31.1). Code breaks should be shown on P&IDs and line lists because they change the design rules, the test pressure and the inspection authority. Where a vessel and connected piping are tested together, the test pressure must not overstress the weaker component.
Q14What does ASME B31.4 cover?
Short answer: Pipeline transportation of liquids and slurries — crude oil, refined products, NGL, liquid CO2, liquid anhydrous ammonia, liquid alcohols and, since the 2012 edition, slurries.
It covers line pipe, pump stations, terminals, tank farm piping associated with the pipeline and metering. It uses a design factor applied to the specified minimum yield strength (SMYS) rather than the allowable stress tables of B31.3.
Q15What does ASME B31.8 cover, and what is B31.8S?
Short answer: B31.8 covers gas transmission and distribution piping, including compressor and metering stations and offshore gas pipelines; B31.8S is its supplement for managing the integrity of gas pipelines.
A key B31.8 concept is the location class (1 to 4), based on population density along the route, which sets the design factor on SMYS — the more people nearby, the lower the allowed hoop stress.
Q16What is ASME B31.5 used for?
Short answer: Refrigerant, brine and secondary coolant piping and heat transfer components in refrigeration systems.
Typical users are cold stores, food processing, dairies and industrial ammonia refrigeration. Where ammonia is part of a production process, owners sometimes specify B31.3 instead — always check the spec.
Q17What is ASME B31.9 used for?
Short answer: Building services piping — heating water, chilled water, low-pressure steam, condensate and similar utilities in commercial and institutional buildings.
Its scope is limited by pressure, temperature and pipe size, so higher-energy systems in the same building default to B31.1. Hospitals, airports and universities are typical B31.9 projects.
Q18Is ASME B31.11 still used for slurry pipelines?
Short answer: No. B31.11 was withdrawn and its requirements were incorporated into ASME B31.4, now titled Pipeline Transportation Systems for Liquids and Slurries.
Older interview lists still quote B31.11. Saying “slurry is now covered in B31.4” is a simple way to show you follow current editions. Typical slurries are mineral concentrate, coal, phosphate and tailings.
Q19What is ASME B31.12?
Short answer: ASME B31.12 Hydrogen Piping and Pipelines covers piping and pipelines in gaseous and liquid hydrogen service.
It addresses hydrogen embrittlement through material performance factors, hardness limits and toughness rules that are stricter than B31.3. With green hydrogen and ammonia projects growing, it is now a common question for process and pipeline roles.
Q20What are ASME B31J, B31G, B31E, B31Q and B31T?
Short answer: Supporting B31 standards: B31J gives stress intensification and flexibility factors; B31G evaluates remaining strength of corroded pipelines; B31E covers seismic design; B31Q qualifies pipeline personnel; B31T sets toughness requirements.
B31J matters to stress engineers because current B31.3 and B31.1 editions use it for SIFs instead of the old appendix tables — results in CAESAR II can change when you switch.
Interview tip
If asked to “list the B31 codes”, add the status: “B31.2 and B31.11 are withdrawn; slurry went into B31.4 and hydrogen has B31.12.” Few candidates say this, and interviewers notice.
Section 3: ASME B16 and MSS component standards (Q21–Q28)
Q21What is the ASME B16 series?
Short answer: ASME B16 is the family of standards for piping components — flanges, fittings, valves, gaskets and end preparations — covering dimensions, tolerances, pressure–temperature ratings, materials and marking.
The B31 codes list B16 standards as “listed components”, which means a compliant flange or fitting can be used up to its rating without separate pressure design calculations.
| Standard | Covers | Size / class range |
|---|---|---|
| ASME B16.5 | Pipe flanges and flanged fittings | NPS ½–24; Classes 150, 300, 400, 600, 900, 1500, 2500 |
| ASME B16.47 | Large-diameter steel flanges (Series A and B) | NPS 26–60; Classes 75 (Series B), 150–900 |
| ASME B16.9 | Factory-made wrought butt-welding fittings | NPS ½–48 |
| ASME B16.11 | Forged socket-welding and threaded fittings | Classes 2000, 3000, 6000, 9000 |
| ASME B16.10 | Face-to-face and end-to-end dimensions of valves | All common valve types |
| ASME B16.34 | Valves — flanged, threaded and welding end | Standard, special and limited class ratings |
| ASME B16.20 | Metallic gaskets — ring joint, spiral wound, jacketed, grooved | For B16.5 and B16.47 flanges |
| ASME B16.21 | Nonmetallic flat gaskets | Full-face and ring types |
| ASME B16.25 | Butt-welding end preparations | Bevel geometry for pipe, fittings, valves |
| ASME B16.36 | Orifice flanges | Classes 300–2500 |
| ASME B16.48 | Line blanks — spectacle blinds, spades, spacers | Classes 150–2500 |
Q22Why is ASME B16.5 so important?
Short answer: It makes flanges interchangeable by fixing dimensions, drilling, facings and bolting for seven pressure classes, and it gives the pressure–temperature ratings that decide which class a line needs.
Remember that the class number is not a pressure: an A105 (Group 1.1) Class 150 flange is rated about 19.6 bar at 38 °C but falls steadily with temperature. Always read the rating table for the material group at design temperature. See our ASTM A105 flange rating guide.
Q23Is it correct to say “ANSI B16.5 flange”?
Short answer: It is common shop-floor language but technically outdated — ASME writes the standard; ANSI only accredits it as an American National Standard. Write “ASME B16.5” on drawings and purchase orders.
“ANSI Class 150” on a datasheet usually means ASME B16.5 Class 150, but ambiguous references cause wrong quotations, especially for large flanges where B16.47 Series A and Series B are not interchangeable.
Q24What is the difference between ASME B16.47 Series A and Series B?
Short answer: Both cover NPS 26–60 flanges, but Series A (from MSS SP-44) is heavier with fewer, larger bolts, while Series B (from API 605) is lighter and more compact with more, smaller bolts. They do not mate with each other.
Specify the series on every large-bore line and check equipment nozzles — a vendor supplying a Series B nozzle for Series A piping is a classic site clash.
Q25What is MSS, and which MSS standards matter to piping engineers?
Short answer: The Manufacturers Standardization Society of the Valve and Fittings Industry publishes Standard Practices (SP) for valves, fittings, flanges, supports and marking that complement ASME and API.
The ones you will meet most are in the table below; SP-58 (supports), SP-75 (high-yield fittings) and SP-97 (branch outlets) are the favourites in interviews.
| MSS SP | Subject | Where you use it |
|---|---|---|
| SP-6 | Finishes for contact faces of flanges and valve/fitting end flanges | Gasket seating surface roughness |
| SP-25 | Standard marking system for valves, fittings, flanges and unions | Receiving inspection |
| SP-43 | Wrought and fabricated butt-welding fittings for low-pressure, corrosion-resistant service | Light-wall stainless (Sch 5S/10S) |
| SP-44 | Steel pipeline flanges | High-yield pipeline flanges |
| SP-58 | Pipe hangers and supports — materials, design, manufacture, selection and installation | Support design (absorbed SP-69, SP-89 and SP-127) |
| SP-75 | High-strength wrought butt-welding fittings | Pipelines with API 5L X-grade pipe |
| SP-79 / SP-83 | Socket-welding reducer inserts / Class 3000 and 6000 unions | Small-bore piping |
| SP-95 | Swage(d) nipples and bull plugs | Small-bore reductions and closures |
| SP-97 | Integrally reinforced forged branch outlet fittings | Weldolets, sockolets, threadolets, elbolets, latrolets |
Q26What is MSS SP-97, and why use an olet instead of a reinforcing pad?
Short answer: SP-97 covers integrally reinforced forged branch outlets (weldolet, sockolet, threadolet, elbolet, latrolet, nippolet). The reinforcement is built into the forging, so no separate pad is needed.
Olets avoid the trapped crevice and tell-tale hole of a pad, are easier to radiograph than a pad weld and suit branches one or more sizes smaller than the run. Your pipe class branch table states when to use a tee, olet or reinforced stub-in.
Q27What is MSS SP-75 used for?
Short answer: High-strength wrought butt-welding fittings — elbows, tees, reducers and caps — designed to match high-yield line pipe such as API 5L X52 to X70.
B16.9 fittings are rated against the matching pipe material and schedule; SP-75 fittings are designed around the pipeline’s SMYS and design factor, so they are used on B31.4 and B31.8 pipelines and station piping.
Q28Which standard covers pipe hangers and supports?
Short answer: MSS SP-58, which now combines the old SP-69, SP-89 and SP-127 into one document on materials, design, selection, fabrication and installation of supports.
Support spacing and loads come from the piping code and the stress analysis; SP-58 gives the component types (clamps, rods, spring hangers, guides) and their load ratings. Check spans with the Aienginear pipe support spacing calculator.
Section 4: ASME Boiler and Pressure Vessel Code for piping engineers (Q29–Q35)
Q29What is the ASME Boiler and Pressure Vessel Code (BPVC)?
Short answer: The BPVC is ASME’s code for boilers, pressure vessels and nuclear components, issued as numbered sections on a two-year cycle — the current edition is 2025.
Piping engineers use it even though piping is a B31 subject: B31 codes call up Section II for material properties, Section V for NDE methods and Section IX for welding qualification, and Section I governs boiler external piping jurisdiction.
| Section | Title / subject | Relevance to piping |
|---|---|---|
| I | Power Boilers | High — boiler external piping jurisdiction |
| II | Materials — Part A ferrous, B nonferrous, C welding consumables, D properties | High — allowable stresses and material data |
| III | Nuclear facility components | Nuclear projects only |
| IV | Heating Boilers | Building heating plants |
| V | Nondestructive Examination | High — RT, UT, MT, PT, VT, ET, leak testing methods |
| VI / VII | Care and operation of heating boilers / power boilers | Operations guidance |
| VIII | Pressure Vessels — Division 1, 2 and 3 | High — vessels, exchangers, code breaks |
| IX | Welding, Brazing and Fusing Qualifications | High — WPS, PQR, WPQ, P-Numbers |
| X | Fiber-Reinforced Plastic Pressure Vessels | FRP vessels |
| XI | In-service inspection of nuclear components | Nuclear only |
| XII | Transport Tanks | Road and rail tanks |
| XIII | Rules for Overpressure Protection | Relief devices for BPVC equipment |
Q30What does ASME Section II contain?
Short answer: Material specifications (SA- and SB- versions of ASTM specifications, SFA for weld consumables) and, in Part D, allowable stresses and physical properties versus temperature.
B31.3 has its own allowable stress tables in Appendix A, but B31.1 and the BPVC use Section II Part D. Section II Part C (SFA specifications) mirrors the AWS A5 filler metal specifications.
Q31What is ASME Section V, and does it set acceptance criteria?
Short answer: Section V defines how NDE methods are performed — RT, UT, MT, PT, VT, ET and leak testing — but acceptance criteria come from the construction code that invokes it.
For example, B31.3 Table 341.3.2 sets which weld imperfections are acceptable for each service; Section V only says how to take and interpret the radiograph or UT scan correctly. Saying this clearly is a strong QA/QC answer.
Q32What is ASME Section VIII, and why should a piping engineer know it?
Short answer: Section VIII gives rules for pressure vessels — Division 1 (design by rule), Division 2 (alternative rules, design by analysis) and Division 3 (very high pressure).
Piping engineers deal with Section VIII at nozzles: allowable nozzle loads, code breaks, and joint testing of vessel and piping. Division 1 standard hydrotest is 1.3 × MAWP × stress ratio, which differs from B31.3’s 1.5 × factor — another reason to keep code breaks clear.
Q33What is ASME Section IX?
Short answer: Section IX qualifies welding, brazing and fusing procedures and the people who perform them, through the WPS, PQR and WPQ.
The WPS is the instruction to the welder; the PQR records the test coupon actually welded and tested to support it; the WPQ records a welder’s or welding operator’s qualification test. Section IX groups base metals by P-Number and filler metals by F- and A-Numbers to reduce the number of qualifications needed.
Q34What are essential, supplementary essential and nonessential variables?
Short answer: Essential variables change mechanical properties and require requalification; supplementary essential variables matter only when impact toughness is required; nonessential variables can be changed by revising the WPS without a new PQR.
Examples: changing P-Number or exceeding the qualified thickness range is essential; increasing heat input beyond the PQR when Charpy testing is required is supplementary essential; changing groove design is usually nonessential.
Q35What is the difference between examination and inspection in ASME B31.3?
Short answer: Examination is the quality control work done by the manufacturer, fabricator or erector (visual, RT, UT and so on); inspection is the verification done by or for the owner by the owner’s inspector.
Mixing up these terms is common. In B31.3, the examiner performs the required examinations and the owner’s inspector verifies that all required examinations and tests have been completed and documented.
Section 5: API inspection and integrity standards (Q36–Q42)
Q36What is API, and which API documents do piping engineers use most?
Short answer: The American Petroleum Institute writes standards for the oil and gas industry. Piping engineers use its in-service inspection documents (API 570, 574, 571, 578, 579-1, 580/581) and its product standards (API 5L, 6D, 600, 602, 598, 1104).
A good way to remember them: B31 codes build new piping; API 570 and its companions keep it safe once it is running.
| Document | Type | Subject |
|---|---|---|
| API 570 | Code | Inspection, repair, alteration and rerating of in-service piping (5th edition, 2024) |
| API RP 574 | RP | Inspection practices for piping system components |
| API RP 571 | RP | Damage mechanisms affecting fixed equipment in refining |
| API RP 578 | RP | Guidelines for a material verification program (PMI) for alloy piping |
| API 579-1/ASME FFS-1 | Standard | Fitness-for-service assessment of damaged equipment |
| API RP 580 / API RP 581 | RP | Risk-based inspection — programme elements / quantitative methodology |
| API 5L | Specification | Line pipe (PSL 1 and PSL 2) |
| API 1104 | Standard | Welding of pipelines and related facilities |
| API 6D | Specification | Pipeline and piping valves |
| API 600 / 602 / 608 / 609 / 594 | Standards | Gate, compact (forged), ball, butterfly and check valves |
| API 598 | Standard | Valve inspection and testing |
| API 2201 | RP | Safe hot tapping practices |
Q37What does API 570 cover?
Short answer: API 570 is the piping inspection code for in-service metallic and FRP piping in the petroleum and chemical industries — it covers inspection, repair, alteration and rerating after the piping has been placed in service.
It defines inspection intervals by piping class or by RBI, thickness measurement locations (TMLs, now called condition monitoring locations), corrosion rate and remaining life calculations, and who may authorise repairs. The latest edition was issued in 2024.
Q38What is API RP 574?
Short answer: API RP 574 gives practical inspection practices for pipe, tubing, valves, fittings and pressure-relieving devices, supporting API 570.
It covers where corrosion typically occurs (injection points, dead legs, soil-to-air interfaces, corrosion under insulation), methods for thickness measurement and how to determine retirement thickness.
Q39What is API RP 571, and why does it matter?
Short answer: API RP 571 describes damage mechanisms in refining and petrochemical equipment — what causes them, which materials are affected, what they look like and how to inspect for them.
Examples include sulfidation, CUI, chloride stress corrosion cracking, wet H2S damage, high-temperature hydrogen attack, creep and mechanical fatigue. You cannot pick the right NDE method until you know which mechanism you are looking for.
Q40What is API RP 578 and PMI?
Short answer: API RP 578 sets up a material verification programme so that alloy components installed are the alloys specified, typically using positive material identification (PMI) by XRF or OES.
A carbon steel elbow accidentally installed in a 9Cr or stainless line can fail rapidly. PMI is applied to new construction and to maintenance work and is often required 100% for alloy piping in hazardous service.
Q41What is API 579-1/ASME FFS-1?
Short answer: A joint API–ASME standard with fitness-for-service procedures to decide whether damaged equipment can keep operating, needs rerating or must be repaired or replaced.
It covers general and local metal loss, pitting, cracks, laminations, dents and gouges, fire damage, creep and more, at three assessment levels — Level 1 screening up to Level 3 detailed analysis.
Q42What is risk-based inspection (RBI)?
Short answer: RBI sets inspection scope and intervals from the risk of each item — probability of failure times consequence of failure — rather than fixed time intervals, using API RP 580 for the framework and API RP 581 for the quantitative method.
API 570 allows RBI-based intervals instead of the default interval table, which lets plants focus inspection effort and turnaround budgets where the risk really is.
Common interview mistake
Do not say API 570 is used to design new piping. It applies after the piping is in service; new construction follows B31.3 or the applicable construction code. Repairs under API 570 still refer back to the construction code for materials, welding and testing.
Section 6: ASTM, AWS, AMPP, ISO and other bodies (Q43–Q49)
Q43Which organizations publish the standards piping engineers use?
Short answer: Mainly ASME, API, ASTM, MSS, AWS, AMPP (formerly NACE and SSPC), ISO, AWWA and, in Europe, CEN through EN standards; ANSI accredits US standards developers.
| Organization | Focus | Examples used in piping |
|---|---|---|
| ASME | Pressure equipment, piping and components | B31 series, BPVC, B16, B36.10M/19M, PCC-1, PCC-2 |
| API | Oil and gas equipment and integrity | API 570, 574, 571, 578, 5L, 6D, 600, 1104 |
| ASTM International | Materials and test methods | A106, A53, A333, A335, A312, A105, A182, A234, A193/A194, A370 |
| MSS | Valves, fittings, flanges, supports | SP-25, SP-44, SP-58, SP-75, SP-97 |
| AWS | Welding | A2.4 symbols, A5 filler metals, D1.1 structural, QC1 (CWI) |
| AMPP (NACE + SSPC) | Corrosion control and coatings | NACE MR0175/ISO 15156, MR0103, SP0169, SSPC-SP 10 |
| ISO | International standards | ISO 15649, ISO 3183, ISO 15614-1, ISO 9606-1, ISO 9001 |
| CEN (EN) | European standards | EN 13480 metallic industrial piping, EN 1092-1 flanges |
| AWWA | Water supply and treatment | C200 steel water pipe, C207 flanges, Manual M11 |
| ANSI | Accredits US standards developers | Approves ASME, API, ASTM documents as American National Standards |
| AISI | Steel industry association | Legacy grade names (AISI 304, 316) — specify ASTM/UNS on documents |
Q44What is ASTM, and why must a material always carry an ASTM designation?
Short answer: ASTM International publishes material specifications and test methods. A full designation such as “ASTM A106 Grade B, seamless” fixes chemistry, mechanical properties, manufacturing route, heat treatment, testing and marking.
“Carbon steel pipe” alone is not purchasable. Inspectors check the mill test certificate (EN 10204 type 3.1 is typical) against the ASTM grade and any supplementary requirements in the pipe class.
Q45What is the difference between ASTM A106, A53 and API 5L?
Short answer: A106 is seamless carbon steel pipe for high-temperature service; A53 is seamless or welded pipe for general and lower-temperature service; API 5L is line pipe for pipelines. Mills often triple-certify A106 B / A53 B / API 5L B.
Low-temperature service needs ASTM A333 Grade 6; elevated-temperature alloy service uses A335 P11, P22 or P91. See 50 piping interview questions for materials detail.
Q46What is AWS, and does AWS D1.1 apply to pressure piping?
Short answer: The American Welding Society publishes welding standards, symbols and the CWI certification. AWS D1.1 is for structural steel, not pressure piping — pressure piping welding is qualified to ASME Section IX (or API 1104 for pipelines).
AWS A2.4 welding symbols and AWS A5 filler metal specifications are used on piping projects every day, and pipe rack and support steel is often welded to D1.1.
Q47What is AMPP, and what happened to NACE?
Short answer: AMPP (Association for Materials Protection and Performance) was formed in 2021 by merging NACE International and SSPC. It now maintains the former NACE standards on corrosion, cathodic protection and coatings.
The best-known is NACE MR0175/ISO 15156 for materials in H2S-containing oil and gas production; refineries use NACE MR0103/ISO 17945. Hardness limits such as 22 HRC for carbon steel weldments come from these documents.
Q48Which ISO and EN standards are relevant to piping?
Short answer: ISO 15649 (petroleum and natural gas industry piping, which references B31.3), ISO 3183 (line pipe), ISO 15614-1 and ISO 9606-1 (welding procedure and welder qualification), ISO 14692 (GRP piping) and EN 13480 (European metallic industrial piping).
ISO 9001 covers quality management systems rather than technical design, but most clients require fabricators to hold it.
Q49What is AWWA, and when would a piping engineer use it?
Short answer: The American Water Works Association publishes standards for potable water systems — pipe, fittings, valves, linings, coatings and design manuals.
Use it for raw water intakes, water transmission lines and municipal tie-ins: AWWA C200 for steel water pipe, C207 for flanges and Manual M11 for steel pipe design. AWWA C207 flanges are not the same as B16.5 flanges.
Section 7: Regulations, project documents and editions (Q50–Q55)
Q50What is the EU Pressure Equipment Directive (PED)?
Short answer: PED 2014/68/EU is the European law for pressure equipment, including piping, above 0.5 bar. It classifies equipment into categories I–IV by fluid group, pressure and size, sets essential safety requirements and requires CE marking with Notified Body involvement for higher categories.
Piping supplied to Europe is often designed to EN 13480 to show conformity. Small piping can fall under Article 4(3), sound engineering practice, without CE marking. Great Britain uses the similar Pressure Equipment (Safety) Regulations 2016 with UKCA marking.
Q51What is a piping material specification (pipe class)?
Short answer: A pipe class lists every permitted component for one service envelope — pipe, fittings, flanges, gaskets, bolting, valves and branch connections — with material grades, ratings, wall thickness by size and the governing code.
It turns the code and standards into a buyable, checkable list. Learn more in pipe fittings dimensions and materials and types of pipe fittings.
Q52Which edition of a code should you use on a project?
Short answer: The edition named in the contract. For B31.3, the latest edition issued at least six months before the original contract date for the first phase of the work governs, unless the parties agree otherwise.
Do not switch to a newer edition mid-project without a formal change; later editions can be used by agreement when they help. For in-service work, API 570 normally points back to the original construction code edition, or a later one if it is compatible.
Q53What are code interpretations and code cases?
Short answer: Interpretations are ASME’s official replies to written inquiries on what an existing paragraph means; code cases are approved alternatives or additions (for example, a new material) that may be used before they are written into the code.
Interpretations do not change the code. A code case is only valid if the owner accepts it and it is still current for the edition being used.
Q54How do you resolve a conflict between the code, a standard and the client specification?
Short answer: Apply the stricter requirement where possible, follow the contract’s order-of-precedence clause, and raise a technical query (TQ) to the client for anything unresolved — never quietly pick the easier option.
Typical conflicts: a spec requiring PWHT below the code thickness limit (follow the spec), or a datasheet rating that disagrees with the pipe class (raise a TQ). Record the agreed answer so it reaches the fabrication and inspection teams.
Q55What should you emphasise when discussing codes and standards in an interview?
Short answer: Show that you can apply them: identify the governing code, link each component to its standard, explain how the project spec sits on top, and give a real example of a code break, a conflict you resolved or an inspection finding.
Mention current-edition awareness (B31.3-2024, BPVC 2025, API 570-2024), the withdrawn sections, and the difference between construction codes and in-service codes. That combination marks you as someone who can be trusted on site.
Numbers and designations to remember
| Item | Value / designation | Reference |
|---|---|---|
| B31.3 hydrostatic test | ≥ 1.5 × design pressure × ST/S, hold ≥ 10 min | ASME B31.3 para. 345.4 |
| B31.3 pneumatic test | 1.1 × design pressure | ASME B31.3 para. 345.5 |
| B31.1 pneumatic test | 1.2 × design pressure | ASME B31.1 |
| Category D limits | ≤ 1035 kPa (150 psig); −29 °C to 186 °C; nonflammable, nontoxic | ASME B31.3 para. 300.2 |
| Normal service random examination | 5% of circumferential butt welds (RT or UT) | ASME B31.3 para. 341.4.1 |
| Straight pipe pressure design | t = PD / 2(SEW + PY) | ASME B31.3 eq. (3a) |
| B16.5 flange classes | 150, 300, 400, 600, 900, 1500, 2500 (NPS ½–24) | ASME B16.5 |
| Large flanges | NPS 26–60, Series A or B | ASME B16.47 |
| Socket-weld/threaded fitting classes | 2000, 3000, 6000, 9000 | ASME B16.11 |
| Current BPVC edition | 2025 (two-year cycle) | ASME BPVC |
| Current in-service piping code | API 570, 5th edition (2024) | API 570 |
| Withdrawn B31 sections | B31.2 (fuel gas), B31.11 (slurry → B31.4) | ASME |
Quick self-test: 10 piping codes questions
Test yourself before the interview. Choose an answer for each question, then press “Check my answers”.
Frequently asked questions
What are the most important piping codes for an interview?
ASME B31.3 and B31.1 first, then B31.4 and B31.8 for pipeline roles. Add ASME B16.5, B16.9, B16.11, B16.20, B16.47 and B36.10M, BPVC Sections II, V, VIII and IX, MSS SP-58 and SP-97, and API 570 with API 571, 574 and 578 for inspection roles.
Is ASME B31.3 mandatory?
ASME B31.3 becomes mandatory when a law, jurisdiction or contract adopts it. In most oil, gas and chemical projects the owner specification names it as the governing code, which makes it contractually binding.
What is the latest edition of ASME B31.3?
ASME B31.3-2024 is the current edition. ASME revises B31.3 about every two years, but a project uses the edition named in its contract.
What is the difference between ASME B31.3 and API 570?
ASME B31.3 is a construction code for new process piping. API 570 is an in-service code for inspection, repair, alteration and rerating after the piping is in operation.
Are ASME B31.2 and B31.11 still valid?
No. B31.2 Fuel Gas Piping has been withdrawn; fuel gas in buildings now follows NFPA 54/ANSI Z223.1 or local codes. B31.11 Slurry Transportation was withdrawn and merged into ASME B31.4.
Which code is used for piping in Pakistan and the Middle East?
Most refineries, fertilizer, petrochemical and power projects in Pakistan and the Gulf use ASME B31.3 and B31.1 with the owner’s specifications, such as Saudi Aramco SAES-L standards, plus local boiler and pressure vessel regulations. European-supplied packages may also follow PED and EN 13480.
Conclusion
Codes and standards are where piping interviews separate memorisation from understanding. Know which B31 section governs which plant, which B16, MSS and ASTM standards sit behind every component, how BPVC Sections II, V, VIII and IX connect to piping, and how API 570 takes over once the plant is running. Keep your answers current — B31.3-2024, BPVC 2025, API 570-2024, B31.11 merged into B31.4 — and back each one with a real project example.
Related Aienginear guides and tools
References
- ASME B31.3-2024 Process Piping; ASME B31.1 Power Piping; ASME B31.4, B31.5, B31.8/B31.8S, B31.9, B31.12, B31J (current editions)
- ASME Boiler and Pressure Vessel Code, 2025 edition — Sections I, II, V, VIII and IX
- ASME B16.5, B16.9, B16.11, B16.20, B16.34, B16.47; ASME B36.10M and B36.19M; ASME PCC-1
- API 570 (5th edition, 2024), API RP 571, 574, 578, 580, 581; API 579-1/ASME FFS-1
- MSS SP-58, SP-75, SP-97; NACE MR0175/ISO 15156; EU PED 2014/68/EU; EN 13480