50 Piping Interview Questions and Answers (2026): Codes, Materials, Fittings & Stress

50 piping interview questions and answers 2026 – Aienginear guide covering ASME B31.3, B16.5 flanges, materials and stress analysis

50 piping interview questions and answers for 2026 by Aienginear — NPS and schedules, ASTM materials, fittings, ASME B16.5 flanges, B31.3 hydrotest and pneumatic testing, and pipe stress analysis, with printable tables, a self-test quiz and a free PDF.

Pipe Fittings Manufacturing Process: Elbows, Tees, Reducers and Caps (2026 Guide)

Pipe fittings manufacturing process guide by Aienginear covering elbows, tees, reducers, caps and stub ends to ASME B16.9-2024

How pipe fittings are manufactured: hot mandrel and cold-formed elbows, hydraulic bulge and hot extrusion tees, reducers, caps and stub ends, with ASME B16.9-2024 and ASTM A234/A403 heat treatment and testing rules.

Heat Exchangers: Types, Working Principle, TEMA Design and Maintenance Guide

Heat exchangers explained by a turnaround engineer: how they work, every major type, TEMA AES/BEM/BEU designations, a worked LMTD sizing example, typical U and fouling values, current codes (TEMA 11th ed., ASME VIII, API 660/661/662), materials, damage mechanisms, tube NDT and a step-by-step maintenance procedure with printable tables and calculators.

Long Activities and Critical Path in Turnaround: CPM Guide

Long activities and critical path in turnaround scheduling explained: total, free, zero and negative float, a worked CPM forward/backward pass, how discovery work shifts the critical path, DCMA/AACE schedule checks, Primavera P6 longest path, PERT risk and crashing vs fast-tracking.

Plant Turnaround & Shutdown Management: Complete Planning, Execution & Startup Guide

Plant turnaround and shutdown management guide: T-minus milestones, scope freeze, job packs, critical path, positive isolation, gas testing, ASME PCC-1 bolting, PSSR startup, KPIs, calculators and printable Aienginear checklists.